Schüco AD UP 75 Door Installation | TJX Watford

A bespoke Schüco curtain wall and access door installation by Rock Maintenance has provided a permanent maintenance access solution at TJX Watford. By reducing reliance on potential crane hire, road closures and other expensive external access arrangements, the installation is expected to deliver significant annual maintenance savings.

A maintenance challenge above a busy Watford road
Maintaining commercial buildings can present challenges that go well beyond routine repairs, particularly when access is restricted by surrounding roads, infrastructure or the building's original design.
At the TJX European headquarters in Watford, a glazed pedestrian footbridge connects two office buildings above Clarendon Road, directly opposite Watford Junction railway station.
The location is particularly busy, with regular traffic, pedestrians and shuttle buses transporting visitors to the Warner Bros. Studio Tour London, home of the Harry Potter attraction.
For the building's maintenance teams, cleaning and servicing the exterior of the elevated walkway presented a significant access problem.
Traditionally, work of this nature would require specialist access equipment, potentially including cranes, road closures and associated traffic management.
With the footbridge positioned above a busy road junction, these arrangements would be expensive, disruptive and difficult to organise.
And with exterior cleaning required approximately every six months, the costs would not be a one-off expense.
The challenge was to find a permanent solution that would make future maintenance considerably more practical and cost-effective.

Replacing fixed glazing with a bespoke access door
Rock Maintenance was commissioned to remove an existing fixed glazed section within a Schüco FW 50 curtain wall system and replace it with a bespoke Schüco AD UP 75 access door.
The new door was fabricated specifically for the installation, integrating with the existing curtain wall structure to provide a dedicated access point for specialist teams carrying out external cleaning, servicing and repairs.
The solution incorporated the Schüco FWS 50 aluminium curtain wall system, with bespoke fabricated components designed to integrate into the existing glazed structure.
Instead of the original fixed panel, the new installation provides a dedicated opening through which appropriately equipped specialist teams can access the walkway exterior for cleaning, servicing and repairs.
The project involved:
Removing the existing fixed glazed panel.
Installing a bespoke Schüco AD UP 75 door into the existing Schüco FW 50 curtain wall system
Fitting a made-to-order glazed access door.
Integrating the new components into the existing glazed structure.
Coordinating the installation with specialist rope access operatives.
Completing the work within the building's restricted access arrangements.
The objective was straightforward: provide a practical maintenance access point without compromising the function of the existing glazed elevation.

Specialist installation without crane access
The installation itself presented an access challenge.
With the building positioned alongside a busy road and transport interchange, conventional external lifting equipment was not a practical option.
Instead, Rock Maintenance planned the installation around the building's existing internal access routes and the use of specialist rope access support.
Mobile glass lifting equipment was transported in sections to the fifth floor and assembled at the work area.
The bespoke fabricated curtain wall components, glazing and door assembly were also moved into position by hand.
These logistical arrangements allowed the installation to proceed without requiring a crane or external lifting operation over the road.
Rock Maintenance's full installation team carried out the glazing and door works, supported externally by the specialist rope access team from Total Services.
The collaboration allowed the existing glazing to be removed and the replacement assembly installed using appropriate equipment and access methods for the location.

Completed in a single morning
Despite the fifth-floor location, restricted external access and bespoke nature of the installation, the work was completed in a single morning.
Rock Maintenance and Total Services coordinated their activities throughout the removal and installation process, combining commercial glazing expertise with specialist rope access capabilities.
The completed Schüco installation provides a permanent maintenance access point within the glazed walkway structure.
This means appropriately trained and equipped maintenance operatives can access the exterior through the new door, reducing reliance on crane-based access arrangements for future visits.

Significant anticipated savings on ongoing maintenance
The greatest benefit of this project extends well beyond the installation itself.
Cleaning, inspecting and maintaining the exterior of an elevated glazed walkway above a busy road presents considerable logistical and financial challenges.
Without suitable access, routine maintenance could require:
Specialist crane or elevated access equipment.
Road closures and traffic management arrangements.
Additional planning and coordination with local authorities.
Specialist contractors and associated equipment.
Disruption to nearby businesses, road users and transport services.
For a building requiring exterior cleaning approximately every six months, repeatedly arranging these operations could represent a substantial ongoing expense.
The new Schüco access installation provides a more practical and cost-effective alternative.
By creating a permanent access point within the existing glazed structure, Rock Maintenance has enabled appropriately equipped specialist teams to access the walkway exterior with reduced reliance on cranes, potential road closures and other costly external access arrangements.
The result is a solution expected to deliver significant annual maintenance savings, while reducing disruption and simplifying the planning of future cleaning, inspection and repair work.
It demonstrates how a carefully considered modification to an existing building can deliver lasting operational and financial benefits.
Commercial glazing solutions designed around the building
Not every commercial glazing project is a straightforward replacement.
Existing building configurations, restricted access, operational requirements and future maintenance needs can all influence the most appropriate solution.
At TJX Watford, the requirement was not simply to install a new door.
It was to address a recurring maintenance access problem through a carefully planned alteration to the building's existing curtain wall glazing.
By combining a bespoke Schüco FWS 50 installation with specialist rope access support from Total Services, Rock Maintenance delivered a permanent solution in a challenging location.
The project demonstrates the value of considering future access, maintenance costs and building operations when planning commercial glazing alterations.

Commercial aluminium doors, curtain walling and specialist glazing

Rock Maintenance works with commercial property owners, facilities managers and building maintenance teams to deliver aluminium door, window and glazing repairs, replacements and specialist installations.
From individual commercial door repairs to bespoke glazing modifications requiring specialist access arrangements, the focus is on practical solutions that address the building's requirements.

Have a commercial glazing or maintenance access problem that needs a different approach?
Contact Rock Maintenance to discuss your project and explore the available options.






Comments